Analisis Pengendalian Banjir Di Saluran Sekunder Irigasi Perot 2 Di Desa Kosambi Kecamatan Cipunagara Kabupaten Subang

Authors

  • Egi Nurfalah Universitas Subang image/svg+xml
  • Sugeng Sutikno
  • Deny Ernawan

DOI:

https://doi.org/10.35569/n5q11342

Abstract

Flood is one of the natural disasters that often occurs in areas close to river bodies or close to irrigation, where the condition of the river/irrigation overflows because the flowing water has exceeded the carrying capacity of the channel. This study aims to determine how the efforts in handling flooding at the research location. This study contains the planning of irrigation channels which starts from the calculation of the mainstay discharge from the cropping pattern around the irrigation flow area, the existing channel discharge and the planned channel discharge which will be compared to determine the difference in discharge that occurs. So this research is a solution to the problem of flooding at the research site. The implementation of flood control is expected to increase the cross-sectional capacity of irrigation secondary channels so that they are able to drain water discharge when the rainy season arrives.

References

[1] S. putri dewina santri Salfia and H. E. A. Hanung, “Merdeka Belajar Kampus Merdeka: Program Magang Mahasiswa Sebagai Upaya Mencetak Sumber Daya Manusia Unggul Dan Berdaya Saing,†COMSERVA Indones. J. Community Serv. Dev., vol. 2, no. 2, pp. 156–164, 2022, doi: 10.59141/comserva.v2i2. 215.

[2] R. M. Bawimbang et al., “Pengendalian Material Proyek Dengan Metode Material Requirement Planning Pada Pembangunan Office and Distribution Center Airmadidi , Minahasa Utara , Sulawesi Utara,†vol. 8, no. 1, pp. 127–134, 2020.

[3] F. Hermawan, D. Ernawan, and Y. Yulianto, “Metode Pelaksanaan Konstruksi Pekerjaan Proyek Pembangunan Dinding Penahan Tanah Blok Ciloa Desa Cijambe Kabupaten Subang,†MESA (Teknik Mesin, Tek. Elektro, Tek. Sipil, Tek. Arsitektur), vol. 7, no. 1, pp. 12–21, 2023, doi: 10. 35569/ftk.v7i1.1988.

[4] D. Oktra, N. Yulius, and B. Anif, “Kajian Manajemen Sumber Daya Yang Mempengaruhi Keterlambatan Proyek (Studi Kasus: Proyek Konstruksi Gedung Di Kota Bukittinggi) Delfa,†Ensiklopedia J., vol. 2, no. 1, pp. 103–108, 2019, [Online]. Available: http:// jurnal.ensiklopediaku.org/ojs-2.4.8-3/index.php/ensiklopedia/ article/view /352

[5] M. Suproyanto, “Perencanaan Perkuatan Dinding Penahan Pada Bantaran Sungai Konto di Kecamatan Pujon Kabupaten Malang,†2015.

[6] Sujiat, “Analisis Stabilitas Dinding Penahan Tanah pada Desa Sokosari Kecamatan Soko Kabupaten Tuban,†J. Cahaya Mandalika, pp. 2479–2484, 2016.

[7] A. Dermawan, S. Syaiful, A. Alimuddin, and F. Fachruddin, “Analisis Stabilitas Dinding Penahan Tanah (Studi Kasus: Desa Mekarjaya, Kecamatan Ciomas, Kabupaten Bogor),†Rona Tek. Pertan., vol. 15, no. 2, pp. 67–81, 2022, doi: 10.17969/rtp.v15i2.27778.

Downloads

Published

24-03-2025

How to Cite

Analisis Pengendalian Banjir Di Saluran Sekunder Irigasi Perot 2 Di Desa Kosambi Kecamatan Cipunagara Kabupaten Subang. (2025). MESA (Teknik Mesin, Teknik Elektro, Teknik Sipil, Teknik Arsitektur), 9(1), 8-12. https://doi.org/10.35569/n5q11342

Most read articles by the same author(s)

<< < 1 2